Commercial Rope bridge

for offshore industrial access

Projects:

Commercial Rope bridge

Locations:

Quebec, Canada

Search Tags:

Rope Bridge Projects

,

Commercial

Batch.Works product catalogue book on a work top with a graphic printed image on the front
Batch.Works product catalogue book on a work top with a graphic printed image on the front
Batch.Works product catalogue book on a work top with a graphic printed image on the front

A cement plant in Quebec lost one of its access bridges and needed its contractors back out on the platforms at sea. Four weeks later, a 22-metre rope bridge was hanging 12 metres above the ocean. It was supposed to be temporary. Three years on, the steel replacement still hadn’t been built, and the people crossing it each day had come to enjoy the ride.

Streetside billboard with flyposters of the Batch.Works brand and illustrations
Streetside billboard with flyposters of the Batch.Works brand and illustrations
Streetside billboard with flyposters of the Batch.Works brand and illustrations
Streetside billboard with flyposters of the Batch.Works brand and illustrations
Streetside billboard with flyposters of the Batch.Works brand and illustrations
Streetside billboard with flyposters of the Batch.Works brand and illustrations

Project Description

Three years after we installed it, we went back to Quebec to inspect the bridge. The approach hadn’t changed. You still walk twenty minutes through a tunnel before you reach the work platforms out at sea, and there it was, a 22-metre rope bridge hanging roughly 12 metres above the ocean. It was only ever meant to hold the line until a permanent steel bridge could be built... and that replacement never arrived.

The original call came from a cement plant after one of its access bridges had collapsed. Contractors couldn’t get to the next platform, and work you can’t reach doesn’t get done. Most people hear “rope bridge” and picture a resort or a family garden. This one had a plainer job: get people across, safely, somewhere that takes Canadian winter snow and then strong summer sun. So how do you put a rope bridge into an industrial marine site in a hurry? Partly by not fighting what’s already there. We fixed our anchor points to the plant’s existing steel frames, so the crossing worked with their infrastructure instead of waiting on new construction. Design, fabrication, shipping and installation took four weeks in total, seven days of it on site. The client was amazed by the pace. I was more interested in whether they’d still be pleased once the urgency had worn off.

They were. The bridge was in working order three years on, doing what it had done in its first week, and the workforce had quietly adopted it. People liked crossing. They liked glancing down and seeing water moving beneath them, a small jolt in the middle of an ordinary shift. The client went as far as telling us they preferred our work to other structures they’d had built at the site. It feels odd calling this one a wish-list, if I’m honest. Nobody was dreaming of anything; they needed a way across. And yet somewhere between the tunnel and the ocean they seem to have ended up with something they never asked for. I’m still not sure I have the right word for it.

Quebec, Canada

Client Brief

:

Industrial, Operator

Key Challenges

:

Urgent, Access

Design Approach

:

Steel-Frame, Anchoring

Outcomes

:

Long-Term, Fixture