TV rope bridge
for a television set
Projects:
TV rope bridge
Locations:
TV Show
Search Tags:
Rope Bridge Projects
,
Broadcast

Sixteen metres of rope bridge, built for a Hollyoaks special and standing about three metres above the set. The production’s riggers had put up the frame before we arrived, so we brought the cables, ropes and boards to meet it. Three days to install, one to take away. Television runs to a clock most builders never see, and I found I rather liked working against it.



Project Description
I’ll be honest, I don’t remember a great deal about the episode itself. What stays with me is the moment the bridge appeared on screen: sixteen metres of rope and board strung across the set of Hollyoaks, and a small jolt of recognition... that one’s ours. By then it had already gone. We’d taken it down not long after the cameras stopped.
Almost every rope bridge we build is meant to stay put. It settles into a garden or a woodland until the family forgets it was ever new. A television bridge asks for something different. The production needed one about three metres off the ground, ready inside a week, then gone again so the set could be put back exactly as it was. Their riggers had already put up the frame when we arrived, with metal anchor points waiting for us, so part of the starting position was decided before we’d unloaded a thing. I didn’t mind that at all. We tensioned the cables first, then laid the ropes and boards and wove everything together by hand. Three days, start to finish.
People sometimes ask whether a proper rope bridge can be built for a film or TV set and then removed cleanly afterwards. It can, and the honest answer is that you plan the leaving as carefully as the arriving. A set is crowded. Lots of separate jobs depend on each other, and anything running late squeezes everyone else. We came back once filming wrapped and had the bridge dismantled in a single day. The production team were delighted with the speed, mostly, I think, because it was one less thing to chase while the rest of the shoot carried on around them. I suppose the wish-list on this one was really about time. Does a structure built to disappear count as any less of a bridge...? I’m not sure it does.
TV Show
Client Brief
:
Television, Production
Key Challenges
:
Tight, Schedule
Design Approach
:
Rigging, Integration
Outcomes
:
Production, Momentum




