Valley rope bridge

for watching from above

Projects:

Valley rope bridge

Locations:

Ireland

Search Tags:

Rope Bridge Projects

,

Commercial

Batch.Works product catalogue book on a work top with a graphic printed image on the front
Batch.Works product catalogue book on a work top with a graphic printed image on the front
Batch.Works product catalogue book on a work top with a graphic printed image on the front

Forty metres of hemp, pine and steel, hung sixteen metres above a ravine in Irish woodland. An adventure centre wanted its motocross crowd off the ground and somewhere better to watch. What we built is a crossing, yes, though mostly it became the best seat on race day. Spectators now run for it before the start.

Streetside billboard with flyposters of the Batch.Works brand and illustrations
Streetside billboard with flyposters of the Batch.Works brand and illustrations
Streetside billboard with flyposters of the Batch.Works brand and illustrations
Streetside billboard with flyposters of the Batch.Works brand and illustrations
Streetside billboard with flyposters of the Batch.Works brand and illustrations
Streetside billboard with flyposters of the Batch.Works brand and illustrations

Project Description

About a week after we’d finished, someone rang to tell me people had been riding motorbikes across it. Across a rope bridge. Sixteen metres up. I’ll be honest, my first feeling wasn’t pride... it was the engineer in me reaching for the load calculations. That isn’t what we built it for, and I’d rather nobody tried it again. But I understood the impulse. This is an adventure centre in Ireland where motocross, paintball and rafting already filled the weekends, and the people who turn up are not short of nerve.

The brief was simpler than that story. The owners had a ravine running through native woodland, a race course below it and spectators stuck watching from the ground. Could we give them somewhere better to stand? I’d usually think of a rope bridge as a way across. This one turned out to be more of a grandstand that happens to cross something, strung forty metres between two enormous beech trees, with clover on the approach and the middle hanging roughly sixteen metres above the ground. People often ask whether rope can really be trusted over a span that long. Fair enough to wonder. In my experience it’s rarely the rope that keeps an engineer awake; it’s where the tension goes once it leaves the deck. Ours runs into purpose-built structures at either end, with steel cables doing the heavy work and natural hemp in our signature weave, which is the part your hands actually find. The pine was left to weather in. Ten days on site.

Race days changed quickly. People began hurrying up through the trees to claim a place on the bridge before the start, which I hadn’t quite predicted, and the owners noticed more feet moving around the whole property, not just along the course. They were amazed, and said so more than once. That ravine had always been there. Nobody had really asked it for anything... I wonder what’s sitting on your land right now, quietly waiting to make it onto a wish-list?

Ireland

Client Brief

:

Adventure, Centre

Key Challenges

:

Span, Tension

Design Approach

:

Hybrid, Engineering

Outcomes

:

Spectator, Draw

More projects...